March 10, 2008 (Day 43)

Floor Pour

The big accomplishment today was the pouring of the new concrete floor in the basement. This will pave the way for a new staircase into the basement from the new back door. The existing stair in the front of the basement will eventually be removed.

Framing continued in the master bedroom as well.