April 28, 2008 (Day 92)

Patchwork

The flooring contractor is finished with the installation of the new flooring in the kitchen, mud room, and master suite. Attention was therefore turned to repair work on the existing floors. Several areas of the existing floors needed repairs. Holes from previous radiator pipes, large HVAC supply vents, and the like were repaired using flooring that was reclaimed from the old cloak nook.